Friday, August 27, 2010

Storm sewer structures scheduled to be removed and replaced have all been completed. The contractor has moved on to removing and replacing sanitary sewer structures in Glenview Road. Flaggers are being used to direct traffic during this work and any delays should be minor.

Friday, August 20, 2010

All the water main crossings have been completed, meaning no more detour! However, the contractor may need to close down one lane of traffic at some point, but in that case flaggers will be used to help direct traffic.

Friday, August 13, 2010

Road Closure Next Week

The project includes water main repairs to the water mains that crosses Glenview Road. There is a new 10” water main that was recently installed (within the last several years) on the north side of Glenview Road. Since we are resurfacing the road, the water main crossings to the streets south of Glenview Road are being replaced and connected to this 10” main. There are five crossings to do. Glenview Road will be closed to all through traffic next week from Monday, August 16th, through Wednesday, August 18th, each day from 7 AM to 5 PM. Residents that have no other access than Glenview Road will of course be able to use the road. We just ask that extreme caution and patience be used around the construction!

Detour Via Central Road


View Larger Map

Project Description

This project includes the replacement of deteriorated manholes, water main repairs, some curb and gutter replacement, and the resurfacing of the road.